Warning: Trying to access array offset on value of type bool in /home/u984968458/domains/cuetgurukul.com/public_html/wp-content/plugins/elementor-pro/modules/dynamic-tags/tags/post-featured-image.php on line 39

Warning: Trying to access array offset on value of type bool in /home/u984968458/domains/cuetgurukul.com/public_html/wp-content/plugins/elementor-pro/modules/dynamic-tags/tags/post-featured-image.php on line 39

Warning: Trying to access array offset on value of type bool in /home/u984968458/domains/cuetgurukul.com/public_html/wp-content/plugins/elementor-pro/modules/dynamic-tags/tags/post-featured-image.php on line 39

Warning: Trying to access array offset on value of type bool in /home/u984968458/domains/cuetgurukul.com/public_html/wp-content/plugins/elementor-pro/modules/dynamic-tags/tags/post-featured-image.php on line 39

CUET Gurukul – Best CUET Coaching Institute in Patna for Online & Offline Prep

Jayalalithaa launches Chennai Metro Rail

Jayalalithaa launches Chennai Metro Rail


Warning: Trying to access array offset on value of type bool in /home/u984968458/domains/cuetgurukul.com/public_html/wp-content/plugins/elementor-pro/modules/dynamic-tags/tags/post-featured-image.php on line 39

Content

The first phase of the much anticipated multi-crore Metro Rail chugged into the city, with Chief Minister J Jayalalithaa flagging off the inaugural service steered by a woman driver. Jayalalithaa launched the services on the Alandur-Koyambedu sector by flagging it off from the state secretariat through live video, throwing open to the public a mass rapid transport system. The route dedicated to the public is an elevated structure covering a distance of 10.15 km, consisting of Alandur, Ekkathuthangal, Ashok Nagar, Vadapalani, Arumbakkam and Koyambedu Railway stations besides the yard at the last stop. The route of the train has been mainly on the busy 100 ft road and would cater to lakhs of commuters when fully completed. The 45 km Metro Rail project is estimated to cost Rs 14,600 crore and would cover two routes� the 23.085 km Wannarapet to Airport section� and the 21.961 km stretch from Chennai Central to St.Thomas Mount. Initially, there will be 9 trains running between Koyambedu and Alandur with a frequency of about 10 minutes, officials said. The trains will halt for 30 seconds in each station. Each Chennai Metro Rail train can carry around 1,200 people with a seating capacity for 200 and standing 1,000. Source: Zee News

Note:

For more updates on topics asked in CLAT, keep visiting CLAT Gurukul which is a knowledge sharing initiative of The Knowledge Tree, Patna’s premier coaching institute for CLAT and for other law entrance exams like AILET, SET, LSAT etc.

RECENT POSTS

Courses

OUR BLOG

CLAT Gurukul is contributing to the Law Entrance Test form a long time and achieved a great rank in terms of Law Entrance Exam Preparation Institutes. Every Competitive exam needs Speed And Accuracy and these are what exactly matters in these kind of exam.

NAVIGATION

NAVIGATION

CLAT Gurukul is contributing to the Law Entrance Test form a long time and achieved a great rank in terms of Law Entrance Exam Preparation Institutes. Every Competitive exam needs Speed And Accuracy and these are what exactly matters in these kind of exam.

Scroll to Top